Tuesday, October 10, 2006

Started cutting and fitting the noggins







Building the base frame









Concreted the 4 back posts

Friday, October 6, 2006

Bank support to prevent erosion







Using offcuts and such, hammered stakes into bank to prevent avalanche whilst I work.

Post holes









Post hole layout



Measured roughly where posts were going and dug 15" holes.



Placed supporting rails at approximate hieght to make it easier to work out final position of posts. Plus I could have a look at eventual size. Which is nice.



Will be using breeze blocks to support middle of frame.

Excavating the bank





With a little help from my JCB big yellow digger





Emptied excavated soil, or slag, under plum tree on plot 2 where the ground slopes, to try to even out the level.

Clearing out the crap







First things first, had to remove all the stuff that had accumulated over the past year. Lots of spiders. Bit damp. Have to tackle the sloping bank next.

Thursday, October 5, 2006

Scale model of allotment workshop





Made scale model (1:25) to assess size in relation to surroundings.